New Shipbuiling Contract for Cassens-Shipyard in Emden

German shipping company Norden-Frisia has ordered a new diesel-electric ferry which will be built at Cassens Werft in Emden. The delivery is expected in summer 2015. According to the shipping company the new build with a modified exhaust after treatment system from Kurre Abgastechnik and with a diesel particle filter. Norden-Frisia says that the power plant will reduce emissions by up to 90% and very fine particulates by up to 99%, “…with this we will have almost the same emission values like with a natural gas driven ferry”. Same like the FRISIA VIII, which was the first German island ferry awarded with the German environmentally quality certificate “Blue Angel Ship Design”, also the new build is planned to receive this award.The vessel will be of identical dimensions to Norden-Frisia’s FRISIA IV, which features 70.7 m. It is planned to have the double ender’s Voith Schneider propellers in combinatory operation, a development which the owners... [More]

Tag cloud